BOQ Services in Egypt: Bills of Quantities and Cost Planning
Accurate Cost Planning Before Construction Begins
Bills of Quantities (BOQ): the short answer
A Bill of Quantities (BOQ) itemizes every material, quantity and unit of work in a project so it can be priced. Laurent prepares BOQs and quantity surveying for projects across Egypt: measured from your drawings by engineers, priced against current market conditions, and structured so contractor bids can be compared line by line.
Problems we solve
Budgets that grow mid-construction
Bids that cannot be compared
Scope gaps that become variations
Unknowns with no allowance
Scope
What our bills of quantities (BOQ) service includes
Project Scope Documentation
The full scope of works broken into clearly defined sections, so every element is accounted for.
Material Take-Offs & Specifications
Precise quantities with the type and grade of every material required.
Unit Pricing & Cost Estimation
Market-aligned unit rates applied to produce a realistic estimate of project cost.
Provisional Sums & Contingencies
Calculated allowances for elements that are undefined or likely to change.
Consistent Measurement Method
Quantities measured to recognized measurement principles for consistency and transparency.
Tendering Support
BOQs structured so contractors can submit accurate, comparable bids.
Process
How we deliver it
Every stage ends with a defined output, so you always know what you're approving.
- 01
Project Review
We review architectural and engineering drawings, specifications and scope documents.
Deliverable: Scope and information checklist
- 02
Measurement & Take-Off
Our engineers measure quantities for every element of the works.
Deliverable: Measured quantities
- 03
Specification Writing
We write clear material and workmanship descriptions for each trade.
Deliverable: Itemized descriptions per trade
- 04
Pricing & Assembly
Unit rates are applied and the BOQ is assembled into a structured document.
Deliverable: Priced BOQ and cost estimate
- 05
Review & Issue
The BOQ is checked for accuracy and consistency, then issued to you.
Deliverable: Final BOQ, priced and tender versions
Why Laurent
Why clients choose Laurent for bills of quantities (BOQ)
Measured by Engineers Who Build
MEP and Structure Measured by Specialists
Rates Grounded in the Egyptian Market
Written for Tendering
Serving Alexandria, Cairo and across Egypt
Our office is in Smouha, Alexandria. We deliver bills of quantities (BOQ) for projects in Alexandria, Cairo and throughout Egypt, with the same team from design to handover.
Industries we serve
FAQ
Bills of Quantities (BOQ): frequently asked questions
How much does a BOQ cost in Egypt?
The fee for a BOQ typically depends on the project’s size and complexity, the number of trades involved and how complete the drawings are. A villa BOQ is a smaller scope than a commercial building with full MEP. Send us your drawings and project details and we will confirm the scope and provide a fee proposal.
How long does it take to prepare a BOQ?
Preparation time typically depends on project size, the number of disciplines and the quality of the drawings provided. Complete, coordinated drawings are measured much faster than drawings that need clarification. Once we review your documents, we confirm a delivery date and list any information we need from you.
What is included in a Bill of Quantities?
A Bill of Quantities includes the scope broken into sections, measured quantities for each item, material and workmanship descriptions, unit rates, provisional sums and contingencies. Laurent issues a priced version for your budget and an unpriced version for contractors, so bids can be compared item by item.
What drawings do you need to prepare a BOQ?
We typically need architectural, structural and MEP drawings plus any specifications or finishes schedules. The more complete the drawings, the more accurate the quantities. If some designs are not finished, we can still prepare a BOQ with provisional sums for undefined items and update it when the design is complete.
What is the difference between a BOQ and a cost estimate?
A BOQ is a detailed, itemized list of measured quantities and descriptions, while a cost estimate is the total expected cost. A priced BOQ produces a reliable cost estimate because every item is measured. Early estimates based on area rates are useful for feasibility but carry more uncertainty than a full BOQ.
Related services
Often delivered together
Construction & Delivery
Commercial Construction
Construction & Delivery
Residential Construction
Insights
Guides from our engineers
Construction Cost Planning in Egypt (2026): A Practical Guide
How to plan construction costs in Egypt in 2026: the cost-planning stages, what drives prices, how to handle currency and material risk, and contingency.
How a Bill of Quantities Protects Your Construction Budget
What is a BOQ? A Bill of Quantities lists every item of work with its quantity and unit, so bids compare fairly and your budget holds. Here's how it works.
Start Your Project
Planning a project that needs bills of quantities (BOQ)?
Tell us what you're building, and our engineering team will guide you through the next step.